AR1-04

The R/V Neil Armstrong left from Charleston, sc, us on Feb 24, 2016 and returned to Charleston, sc, us on Mar 02, 2016.

Summary Table

Operator ID AR1-04
Start Date Feb 24, 2016
End Date Mar 02, 2016
Start Port Charleston, sc, us
End Port Charleston, sc, us
Underway Data Cruise Data
Cruise Notes

Cruise Metadata Notes: This is a shakedown cruise after the PHASEIII science installation shipyard period. The bulk of the data collected on this cruise is for ENGINEERING TESTS and CALIBRATION PURPOSES and may not be published. This includes, but is not limited to EK-80 data, XBT data, ADCP data, and multibeam data collected within the Bahamas EEZ. Primary goals include radiated noise testing at the Navy AUTEC range in the Bahamas, EK-80 calibration, and camera pole work to observe propeller cavitation.

R2R Cruise Data
JSON Metadata (R2R Format) Metadata
JSON Metadata (API) Metadata

Funded Projects

Cruise Science Leadership

  • Gates, Timothy
    Scientist, Chief
    ManTech International Corp.